Blog / Utilities

Utilities

1 article on utilities.

Traffic OS — Call 811 before installing work zone signs

Oct 2, 2026

Call 811 Before Installing Work Zone Signs: Utility Locates for Traffic Control Crews

Driving a sign post or a barricade anchor into the ground is digging. How the 811 before-you-dig process generally works, when traffic control work triggers it, how to build locate lead time into a job, and what to ask the one-call center in each state where you work.