Blog / Pavement markings
Pavement markings
2 articles on pavement markings.

Traffic control plans
Traffic Control for Pavement Marking and Striping Operations
Striping is the classic mobile operation: the work zone moves with the truck, the paint needs time to dry, and the protection is mostly vehicles rather than devices. Here is what the MUTCD 11th Edition says about mobile operations on two-lane and multi-lane roads, and how to plan striping traffic control that protects both the crew and the fresh line.
Sep 23, 2026 · 6 min read

Compliance and work-zone safety
Temporary Pavement Markings in Work Zones: What Contractors Need to Get Right
Temporary markings decide whether a shifted alignment reads correctly at 60 mph at night. Here is how tape, paint, and removable markings differ, what the standards actually require, and where crews and agencies most often collide.
Aug 8, 2026 · 11 min read