Blog / Maintenance
Maintenance
3 articles on maintenance.

Equipment and yards
Portable Message Board Rental: What to Track Between Jobs
What to record on a portable changeable message sign when it comes back from one rental and before it goes out on the next: location, power, display and controller, the message left on it, the trailer, damage and maintenance, plus how weekly and monthly rental billing fits.
Nov 10, 2026 · 6 min read

Running the business
Equipment Maintenance Programs for Traffic Control Fleets
Arrow boards, attenuator trailers, light towers and message signs fail in predictable ways at the worst possible moment. Here is how to build a maintenance program that matches how this equipment is actually used.
Sep 11, 2026 · 6 min read

Equipment and yards
Sign Retroreflectivity and Device Condition: When a Device Stops Counting
A faded sign and a scuffed drum are not cosmetic problems — a device that no longer performs is functionally not there. How condition standards work, how to run an inspection that catches decline, and how to make retirement a budget line rather than a surprise.
Aug 8, 2026 · 5 min read